Subject: Building 0055 Garrett Hall outages

List archive

[building-0055-outages] *ALERT* *ALERT* Facilities Management HVAC Outage Notice - GARRETT HALL 2020-Oct-23 07:00


Chronological Thread 
  • From: UVA Facilities Management <>
  • To:
  • Subject: [building-0055-outages] *ALERT* *ALERT* Facilities Management HVAC Outage Notice - GARRETT HALL 2020-Oct-23 07:00
  • Date: Fri, 9 Oct 2020 15:10:27 -0400 (EDT)
  • Authentication-results: eifmailuw2p1.az.virginia.edu; spf=pass (virginia.edu: domain of designates 52.37.219.182 as permitted sender)

 

    

7285

    *ALERT*ALERT*ALERT*ALERT*

Facilities Management Outage Notification

Please Post Centrally in Your Department

 

HVAC Outage    


BLDG: 0055 GARRETT HALL
 
Affected Floors / Rooms:  This will impact all portions of the main portion of Garrett Hall, but it will not impact heat in the annex spaces.

Impact to Building Occupants:  No Heating
As part of the Medium Temperature Hot Water conversion project, mechanical work is required in the exterior mechanical room (next to the basement on the west side of the building). This work includes removing a heat exchanger and some piping and replacing it with new valves and new piping.

This outage will impact heat in the original portion of Garrett Hall, but it will not impact heat in the Garrett annex spaces. The construction duration for this work in the exterior mechanical room should last 10 days, but the heating outage is only scheduled for 23 Oct.





Scheduled Start Date and Time:

2020-Oct-23 07:00
Scheduled End Date and Time:

2020-Oct-23 16:00
Reason for Outage:  
As part of the Medium Temperature Hot Water conversion project, mechanical work is required in the exterior mechanical room (next to the basement on the west side of the building). This work includes removing a heat exchanger and some piping and replacing it with new valves and new piping.

Requested By: 
Barry Miller (UVA FM Project Services)

Outage Coordinator  
Ryan Taylor  434-981-8874  
  
POC for Group Performing Work:
Riddleberger, Inc.  Greg Vickers 540.476.2153 Riddleberger Brothers  Michael Moubray  540-578-4772

FM Responsible Person:  Barry Miller  434-760-6832
Customers with Whom the Outage was Coordinated:  
 
Jay Pence

Outage Approved By:
Ryan Taylor (UVA FM Operations)


Important Notes:
  1. The specified utility or building system will be out of service as noted above.  Please advise the Outage Coordinator immediately if this can not be accommodated in areas under your control or direction
  2. Those performing work associated with this outage MUST  notify the Systems Control Center (982-4685) PRIOR TO THE START and upon COMPLETION of all work

*ALERT*ALERT*ALERT*ALERT*

Please use the below link to unsubscribe from these notification, change, or subscribe to other building lists
 

Attachment: Assistance Requested: Zone Maintenance Planned Outage GARRETT HALL HVAC.pdf