building-1150-2m-floor-outages - [building-1150-2m-floor-outages] *ALERT* Health System Planned Outage - Hospital 2M Floor Affected

Subject: Building 1150 2M Floor outages

List archive

Chronological Thread  
  • From: UVA Facilities Management <>
  • To:
  • Subject: [building-1150-2m-floor-outages] *ALERT* Health System Planned Outage - Hospital 2M Floor Affected
  • Date: Tue, 21 May 2024 14:43:49 -0400 (EDT)

 

*ALERT*ALERT*ALERT*ALERT*

Health System Planned Outage Notification

Please Post Centrally in Your Department



Electricity Outage   
Normal Power    
US1-2 Switchgear including all downstream normal power distribution.

 

BLDG: 1150 University Hospital
AFFECTED FLOORS:
  Ground First Second Third Fourth Fifth Sixth Seventh Eighth 2M
UH patient floors 0 thru 8 in West, Central & East Towers including Dietary, Linens, Loading Dock, Main Lobby, the Connector Corridor & the Lee Street Garage.


   

Switchgear testing includes 20 individual 1-minute outages. UH Floors 0 through 8 in East, Central & West are impacted, including Dietary, Linens, Main Lobby, Connector Corridor & Lee Street Garage .
P-Tube system will be out of service for outage duration between 0100 - 0300; couriers / runners will be supporting.

***Please Review Your Local Downtime Activation Plan in Advance of This Outage***

While no interruptions in service are expected, beyond those indicated in this notice, you should review your local area response plan prior to the outage.  For unexpected issues related to this outage please report to Help Desk at 4-2267 and your local clinical leadership for operational response.


Scheduled Start Date and Time: May 30, 2024 at 1:00:00 AM EDT
Scheduled End Date and Time: May 30, 2024 at 3:00:00 AM EDT
Work Order Number: 2547230-93700
  Outage Number:  51

Outage Coordinator: Scott Guynes 434-282-3794
  POC for Group Performing Work:

  Nielsen Builders, Inc.  Adam Goodrich 540-435-9896
Customers with Whom the Outage was Coordinated:

Managers & Administrators in all impacted departments.

The specified utility or utilities will be out of service as noted.  Please advise the Outage Coordinator immediately if this cannot be accommodated in areas under your control or direction.

*ALERT*ALERT*ALERT*ALERT*
Please use the below link to unsubscribe from these notification, change, or subscribe to other building lists
 

Attachment: 19256 Planned Outage Electricity 1150 University Hospital.pdf