[building-1150-2m-floor-outages] *ALERT* Health System Planned Outage - Hospital 2M Floor Affected


Chronological Thread  
  • From: UVA Facilities Management <>
  • To:
  • Subject: [building-1150-2m-floor-outages] *ALERT* Health System Planned Outage - Hospital 2M Floor Affected
  • Date: Thu, 13 Jul 2023 16:06:23 -0400 (EDT)
  • Authentication-results: eifmailue2p1.az.virginia.edu; spf=pass (virginia.edu: domain of designates 52.203.46.154 as permitted sender) ;

 

*ALERT*ALERT*ALERT*ALERT*

Health System Planned Outage Notification

Please Post Centrally in Your Department



HVAC Outage   
   
AHU-2MA-1

 

BLDG: 1150 University Hospital
AFFECTED FLOORS:
  Ground 2M
Central Sterile Supply G041, G043, G043A, G044, G044A-B-C, G045, G046, G047, G047A-B-D, G048, G049, G049A, G050, G050A-B-C-D-E, G051, G052, G053 & G054


   

Shutting down AHU-2M-Temp. West.
Tying in existing ductwork to new AHU-2MA-1.
Testing Commissioning & Air Balancing new AHU-2MA-1.
Periop Leadership is supporting this outage by closing all ORs to elective surgeries on 7/22, thus emergent cases only through the weekend of 7/22-23.

***Please Review Your Local Downtime Activation Plan in Advance of This Outage***

While no interruptions in service are expected, beyond those indicated in this notice, you should review your local area response plan prior to the outage.  For unexpected issues related to this outage please report to Help Desk at 4-2267 and your local clinical leadership for operational response.


Scheduled Start Date and Time: 2023-Jul-21 21:00
Scheduled End Date and Time: 2023-Jul-23 18:00
Work Order Number: 3107699-93700
  Outage Number:  21

Outage Coordinator: Scott Guynes 434-282-3794
  POC for Group Performing Work:

  Lee Building Company  Caleb White 434-962-4530
Customers with Whom the Outage was Coordinated:

Kevin Elgin - Director - CSS
Taylor Bridges - Director - ORs
Lauren Purnell - Administrator - ORs


The specified utility or utilities will be out of service as noted.  Please advise the Outage Coordinator immediately if this cannot be accommodated in areas under your control or direction.

*ALERT*ALERT*ALERT*ALERT*
Please use the below link to unsubscribe from these notification, change, or subscribe to other building lists
 

Attachment: 15373 Planned Outage HVAC 1150 University Hospital.pdf