Electricity Outage
REVISED 2020-Sep-04 07:00 2020-Sep-04 15:00
Emergency Power UPS
Annual Preventive Maintenance of UPS's Systems at 2M M201A (CATH Lab), G053 (Interventional Radiology) & 1003N (MRI Addition).
BLDG: 1150 University Hospital
AFFECTED FLOORS: Ground First Second 2M Annual Preventive Maintenance of UPS's Systems at 2M M201A (CATH Lab), G053 (Interventional Radiology) & 1003N (MRI Addition).
|
Annual Preventive Maintenance of UPS's Systems at 2M M201A (CATH Lab), G053 (Interventional Radiology) & 1003N (MRI Addition). THERE SHOULD NOT BE ANY LOSS OF POWER. NOTE: IN THE EVENT OF INCLEMATE WEATHER, THIS WORK WILL BE RESCHEDULED.
***Please Review Your Local Downtime Activation Plan in Advance of This Outage***
While no interruptions in service are expected, beyond those indicated in this notice, you should review your local area response plan prior to the outage. For unexpected issues related to this outage please report to Help Desk at 4-2267 and your local clinical leadership for operational response.
Scheduled Start Date and Time: |
2020-Sep-02 07:00 |
Scheduled End Date and Time: |
2020-Sep-02 15:00
|
Work Order Number: |
3100722-001 |
Outage Number: |
|
Outage Coordinator: |
John Hennis 434-465-7451 |
POC for Group Performing Work: |
John Hennis 434-465-7451 |
Customers with Whom the Outage was Coordinated:
|
Mike Light
|
The specified utility or utilities will be out of service as noted. Please advise the Outage Coordinator immediately if this cannot be accommodated in areas under your control or direction.