Subject: Building 1150 2M Floor outages
List archive
[building-1150-2m-floor-outages] ***ALERT*** Health System Planned Outage Affecting Hospital 2M Floor - REVISED
Chronological Thread
- From: UVA Facilities Management <>
- To:
- Subject: [building-1150-2m-floor-outages] ***ALERT*** Health System Planned Outage Affecting Hospital 2M Floor - REVISED
- Date: Wed, 23 Oct 2019 16:13:31 -0400 (EDT)
- Authentication-results: eifmailuw2p1.az.virginia.edu; spf=pass (virginia.edu: domain of designates 52.203.46.154 as permitted sender)
*ALERT*ALERT*ALERT*ALERT*
Health System Planned Outage Notification
Please Post Centrally in Your Department
Fire Alarm System Outage -
REVISED
Fire System Panel
Fire System Chimes and Strobes WILL BE ACTIVATED During Testing: 10:00 12:00
BLDG: 1150 University Hospital
Final testing / inspections for Superdoors with OUBO.
*ALERT*ALERT*ALERT*ALERT*
Please use the below link to unsubscribe from these notification, change, or subscribe to other building lists
|
Attachment:
printview.pdf
Description: Adobe PDF document
- [building-1150-2m-floor-outages] ***ALERT*** Health System Planned Outage Affecting Hospital 2M Floor - REVISED, UVA Facilities Management, 10/23/2019
- <Possible follow-up(s)>
- [building-1150-2m-floor-outages] ***ALERT*** Health System Planned Outage Affecting Hospital 2M Floor - REVISED, UVA Facilities Management, 10/23/2019
Archive powered by MHonArc 2.6.19.