Skip to Content.
Sympa Menu

building-1150-2m-floor-outages - [building-1150-2m-floor-outages] *ALERT* Health System Planned Outage - Hospital 2M Floor Affected

Subject: Building 1150 2M Floor outages

List archive

[building-1150-2m-floor-outages] *ALERT* Health System Planned Outage - Hospital 2M Floor Affected


Chronological Thread 
  • From: UVA Facilities Management <>
  • To:
  • Subject: [building-1150-2m-floor-outages] *ALERT* Health System Planned Outage - Hospital 2M Floor Affected
  • Date: Tue, 12 Mar 2019 10:42:02 -0400 (EDT)
  • Authentication-results: fort02.mail.virginia.edu; spf=pass (virginia.edu: domain of designates 52.203.46.154 as permitted sender)

 
*ALERT*ALERT*ALERT*ALERT*
Health System Planned Outage Notification

Please Post Centrally in Your Department


Fire Alarm System Outage 
Fire System Panel

Fire System Chimes and Strobes WILL NOT be activated during testing  
BLDG:  1150 University Hospital

AFFECTED FLOORS:
   Second Third      2M 
Pre-Testing of Fire Alarm System for AHU_2M-10 & RAF_2M-10 replacement units.
Strobes and chimes will be disabled.

  


Scheduled Start Date and Time: 2019-Mar-13 13:00  
Scheduled End Date and Time: 2019-Mar-13 15:00
 
 Outage Number:

 4057141
Work Order Number: 2621262
Outage Coordinator: Bill Shirey 434-962-8812
  POC for Group Performing Work:

   Atlantic Constructors, Inc  Larry Simpson 804 536-2730
Customers with Whom the Outage was Coordinated:

Frank Chapman Fire Systems Technician

The specified utility or utilities will be out of service as noted.  Please advise the Outage Coordinator immediately if this cannot be accommodated in areas under your control or direction.

*ALERT*ALERT*ALERT*ALERT*
Please use the below link to unsubscribe from these notification, change, or subscribe to other building lists
 

Attachment: printview.pdf
Description: Adobe PDF document




Archive powered by MHonArc 2.6.19.

Top of Page