Subject: Building 1150 2M Floor outages
List archive
[building-1150-2m-floor-outages] *ALERT* Health System Planned Outage - Hospital 2M Floor Affected
Chronological Thread
- From: UVA Facilities Management <>
- To:
- Subject: [building-1150-2m-floor-outages] *ALERT* Health System Planned Outage - Hospital 2M Floor Affected
- Date: Thu, 28 Feb 2019 07:56:33 -0500 (EST)
- Authentication-results: fort01.mail.virginia.edu; spf=pass (virginia.edu: domain of designates 52.203.46.154 as permitted sender)
*ALERT*ALERT*ALERT*ALERT*
Health System Planned Outage Notification
Please Post Centrally in Your Department
Fire Alarm System Outage
Sprinkler System
BLDG: 1150 University Hospital
The specified utility or utilities will be out of service as noted. Please advise the Outage Coordinator immediately if this cannot be accommodated in areas under your control or direction.
*ALERT*ALERT*ALERT*ALERT*
Please use the below link to unsubscribe from these notification, change, or subscribe to other building lists
|
Attachment:
printview.pdf
Description: Adobe PDF document
- [building-1150-2m-floor-outages] *ALERT* Health System Planned Outage - Hospital 2M Floor Affected, UVA Facilities Management, 02/05/2019
- <Possible follow-up(s)>
- [building-1150-2m-floor-outages] *ALERT* Health System Planned Outage - Hospital 2M Floor Affected, UVA Facilities Management, 02/12/2019
- [building-1150-2m-floor-outages] *ALERT* Health System Planned Outage - Hospital 2M Floor Affected, UVA Facilities Management, 02/14/2019
- [building-1150-2m-floor-outages] *ALERT* Health System Planned Outage - Hospital 2M Floor Affected, UVA Facilities Management, 02/18/2019
- [building-1150-2m-floor-outages] *ALERT* Health System Planned Outage - Hospital 2M Floor Affected, UVA Facilities Management, 02/28/2019
Archive powered by MHonArc 2.6.19.