Skip to Content.
Sympa Menu

building-1150-2m-floor-outages - [building-1150-2m-floor-outages] *ALERT* Health System Planned Outage - Hospital 2M Floor Affected

Subject: Building 1150 2M Floor outages

List archive

[building-1150-2m-floor-outages] *ALERT* Health System Planned Outage - Hospital 2M Floor Affected


Chronological Thread 
  • From: Veoci <>
  • To:
  • Subject: [building-1150-2m-floor-outages] *ALERT* Health System Planned Outage - Hospital 2M Floor Affected
  • Date: Mon, 1 Oct 2018 10:44:10 -0400 (EDT)
  • Authentication-results: fort01.mail.virginia.edu; spf=pass (virginia.edu: domain of designates 52.203.46.154 as permitted sender)

 
*ALERT*ALERT*ALERT*ALERT*
Health System Planned Outage Notification

Please Post Centrally in Your Department


Fire Alarm System Outage 
Fire System Panel

  
BLDG:  1150 University Hospital

AFFECTED FLOORS:
          2M 
Smoke Detectors in 2M-Central

This Outage Will Occur Daily:  07:00 15:30


Scheduled Start Date and Time: 2018-Oct-07 07:00  
Scheduled End Date and Time: 2018-Oct-13 15:30
 
 Outage Number:

 106
Work Order Number: 2621262-001
Outage Coordinator: Dana Hodges 434-270-4754
  POC for Group Performing Work:

   Atlantic Constructors, Inc  Larry Simpson 804 536-2730
Customers with Whom the Outage was Coordinated:

Frank Chapman

The specified utility or utilities will be out of service as noted.  Please advise the Outage Coordinator immediately if this cannot be accommodated in areas under your control or direction.

*ALERT*ALERT*ALERT*ALERT*
Please use the below link to unsubscribe from these notification, change, or subscribe to other building lists
 

Attachment: printview.pdf
Description: Adobe PDF document




Archive powered by MHonArc 2.6.19.

Top of Page