building-0122-outages - [building-0122-outages] *ALERT* *ALERT* Facilities Management Electricity Normal Power Outage Notice - NEWCOMB HALL - EXTENDED

Subject: Building 0122 Newcomb Hall Outages

List archive

[building-0122-outages] *ALERT* *ALERT* Facilities Management Electricity Normal Power Outage Notice - NEWCOMB HALL - EXTENDED


Chronological Thread  
  • From: UVA Facilities Management <>
  • To:
  • Subject: [building-0122-outages] *ALERT* *ALERT* Facilities Management Electricity Normal Power Outage Notice - NEWCOMB HALL - EXTENDED
  • Date: Tue, 17 Aug 2021 14:34:29 -0400 (EDT)
  • Authentication-results: eifmailue2p1.az.virginia.edu; spf=pass (virginia.edu: domain of designates 52.37.219.182 as permitted sender)

 

    

10928

    *ALERT*ALERT*ALERT*ALERT*

Facilities Management Outage Notification

Please Post Centrally in Your Department

 

Electricity Normal Power Outage  EXTENDED UNTIL  2021-Aug-18 05:00

P1C is fed from main switch gear in the basement and EA is fed from panel EDP. The EDP panel is located in the main switch gear room beside the transfer switch

BLDG: 0122 NEWCOMB HALL
 
Affected Floors / Rooms:  P1C is fed from main switch gear in the basement and EA is fed from panel EDP. The EDP panel is located in the main switch gear room beside the transfer switch

Impact to Building Occupants:  No Electricity
An additional part was necessary that came in today at 2:25pm.





Scheduled Start Date and Time:

2021-Aug-18 05:00
Scheduled End Date and Time:

2021-Aug-18 06:00
Reason for Outage:  
Power to pad for Cooking Oil Project

Requested By: 
Valerie Knapp (UVA FM Operations)

Outage Coordinator  
Wayne Russell  434-531-6994  
  
Customers with Whom the Outage was Coordinated:  
 
Shawn Ragland

Outage Approved By:
Valerie Knapp (UVA FM Operations)


Important Notes:
  1. The specified utility or building system will be out of service as noted above.  Please advise the Outage Coordinator immediately if this can not be accommodated in areas under your control or direction
  2. Those performing work associated with this outage MUST  notify the Systems Control Center (982-4685) PRIOR TO THE START and upon COMPLETION of all work

*ALERT*ALERT*ALERT*ALERT*

Please use the below link to unsubscribe from these notification, change, or subscribe to other building lists
 

Attachment: Assistance Requested: Planned Outage NEWCOMB HALL Electricity.pdf