Skip to Content.
Sympa Menu

building-0067-outages - [building-0067-outages] *ALERT* *ALERT* Facilities Management Electricity Normal Power Outage Notice - Halsey Hall 2026-Aug-11 06:00

Subject: Building 0067 Halsey Hall outages

List archive

Chronological Thread  
  • From: UVA Facilities Management <>
  • To:
  • Subject: [building-0067-outages] *ALERT* *ALERT* Facilities Management Electricity Normal Power Outage Notice - Halsey Hall 2026-Aug-11 06:00
  • Date: Mon, 10 Aug 2026 15:24:50 -0400 (EDT)

 

University of Virginia Logo

    

29332

    *ALERT*ALERT*ALERT*ALERT*

Facilities Management Outage Notification

Please Post Centrally in Your Department

 

Electricity Normal Power Outage    

Panel PDP feeds panel MDP which feeds Panel PP12. MDP will need to be shutdown to feed new wires from MDP to PP12 in the same electrical room. New upsized breaker installed.

BLDG: 0067 Halsey Hall
 
ALL FLOORS AFFECTED  

Impact to Building Occupants:  
Halsey Hall's Electrical will be offline Tuesday morning from 6am until 11am on August 11th. The building will be re-energized soon if work is completed.

Please email our team to confirm the outage at:
Randy Spencer –
Jacob Campbell –
Uriel An –





Scheduled Start Date and Time:

2026-Aug-11 06:00
Scheduled End Date and Time:

2026-Aug-11 10:00
Reason for Outage:   
Re-feed PP12 panel in basement with larger breaker size. Fed from MDP. Will require full building electrical shutdown.

Requested By:  
Logan Kendle

Outage Coordinator   
Donald (Randy) Spencer  434-531-6993 
  
Customers with Whom the Outage was Coordinated:  
 
Anna Towns
Benji Boatwright
Wayne Bourne
Erin Printy
Jacob Campbell

Outage Approved By:
Randy Spencer (UVA FM Operations)


Important Notes:
  1. The specified utility or building system will be out of service as noted above.  Please advise the Outage Coordinator immediately if this can not be accommodated in areas under your control or direction
  2. Those performing work associated with this outage MUST  notify the Systems Control Center (982-4685) PRIOR TO THE START and upon COMPLETION of all work

*ALERT*ALERT*ALERT*ALERT*

Please use the below link to unsubscribe from these notification, change, or subscribe to other building lists

This email was sent on behalf of University of Virginia by Veoci
© 2026 Veoci Inc.
 

Attachment: pdfcH9Y9oHZpj.pdf
Description: Adobe PDF document



  • [building-0067-outages] *ALERT* *ALERT* Facilities Management Electricity Normal Power Outage Notice - Halsey Hall 2026-Aug-11 06:00, UVA Facilities Management, 08/10/2026

Archive powered by MHonArc 2.6.24.